We started with a shed.
The practice began in 2009 with a pump house in Yelahanka and two people who had spent the previous decade on the contractor’s side of the table. We knew what a drawing looked like when it caused a delay, because we had built from those drawings.
Seventeen years later, the work is bigger but the method is the same: understand the operation, draw the maintenance route, stay for the first monsoon.
We do not enter competitions, we do not have a PR consultant, and we have never had a project photographed for a magazine cover. The photographs on this site are for the operations team, so they can recognise their own building.