Infrastructure architecture · 2009—2026
Buildings that have to work on a Tuesday.
A water works, a bus depot and a logistics park do not get to be beautiful on opening day and difficult afterwards. We design the maintenance access before the facade.
Practice14 people
Built3.1 million sq ft
SectorsWater, transport, logistics
Current3 sites on the ground
Fig. 01
Kaveri Water Works, stage 2 — 48 MLD. Commissioned 2024.
12°58′N 77°35′E
We came from the contractor’s side.
Both partners spent their first decade building, not drawing. That is why our drawings carry the sequence: what gets poured first, what has to be accessible in five years, and where the pump goes when it is replaced.
Fourteen people, three sectors, one rule — if the operations team cannot maintain it, we have not finished the drawing.
Three things we do every time.
- 01Interview the people who will run itA plant supervisor knows more about the building than the brief does. We spend the first week with them, not with the client’s brand guidelines.
- 02Draw the maintenance routeAccess for a crane, a pump, a ladder. It goes on the plan before the facade or the landscape.
- 03Stay through the first monsoonWater finds the mistake. We are on site for the first rainy season, and we fix it with the contractor.
Two plates.
What we have built.
| Project | Scale | Year |
|---|---|---|
| Kaveri Water Works, stage 2 | 48 MLD | 2024 |
| Hebbal Bus Depot | 96 bays | 2023 |
| Doddaballapur Logistics Park | 42,000 sq m | 2025 |
| Hosur Vocational Centre | 6,800 sq m | 2022 |
| Tumakuru Bus Terminal | 34 bays | 2021 |
| Yelahanka Pumping Station | 18 MLD | 2019 |
New work.
- Studio
- 4th floor, 22 Infantry Road
Bengaluru 560001 - studio@lrinfraarchitects.com
- Phone
- Enquiries
- We take three projects a year. Send the site and the brief.